BC Hydro + FortisBC Funded Program

Identify Building Operational Inefficiencies.
Implement Funded Improvements.

Outdated schedules. Suboptimal setpoints. Control sequences requiring adjustment. The Continuous Optimization program provides funding to identify these issues and support their resolution—without capital equipment investment.

Program Funding: Up to $0.15/sq ft
Minimum Building Size: 40,000 sq ft
Typical Duration: 10–14 months

What is Continuous Optimization (C-Op)?

Continuous Optimization (C-Op) is a utility-funded building recommissioning program offered by BC Hydro and FortisBC in British Columbia, Canada. The program provides funding up to $0.15 per square foot to identify and correct operational inefficiencies in commercial and institutional buildings over 40,000 square feet.

Unlike traditional energy audits that focus on capital equipment replacement, C-Op targets operational improvements—optimizing existing building automation systems (BAS), HVAC schedules, control sequences, and setpoints. This approach delivers energy savings with minimal capital investment, typically achieving a 1.7-year simple payback.

Program Funding

Up to $0.15/sq ft (75% at investigation report, 25% at completion)

Duration

10–14 months: Investigation (4-6 mo), Implementation (5-6 mo), Completion (1-2 mo)

Minimum Size

40,000 square feet (commercial or institutional)

Average Results

5.7% energy cost reduction (industry aggregate data)

Quick Eligibility Check

  • Building 40,000+ sq ft in British Columbia
  • DDC building automation system with remote access
  • BC Hydro or FortisBC electricity customer
  • No major renovations planned within 12 months

Trusted by utilities and organizations across BC

BC Hydro

Alliance Member

Coquitlam School District

C-Op Delivered

BC Hydro Alliance

of Energy Professionals

Preliminary Eligibility Assessment

Confirm the following requirements:

Require clarification on any criteria?

Operational Deficiencies

Common Investigation Findings

Issues frequently identified during C-Op assessments

Representative examples from commercial and institutional facilities in British Columbia

Economizer Malfunction

Mechanical cooling operating during favourable outdoor conditions (e.g., 10°C ambient)

Obsolete Scheduling

HVAC equipment operating during unoccupied periods based on outdated occupancy assumptions

Unstable VAV Control

Variable air volume boxes cycling continuously, reducing efficiency and occupant comfort

Simultaneous Heating and Cooling

Conflicting system operation within the same zone, resulting in unnecessary energy consumption

Disabled Reset Sequences

Supply air temperature fixed at constant setpoint regardless of actual load conditions

Persistent Manual Overrides

Temporary operator adjustments remaining active beyond their intended duration

Engagement Process

Project Initiation Workflow

A straightforward process to assess eligibility and initiate program participation.

1

Initial Consultation (15 minutes)

Confirm building eligibility and address preliminary questions

2

Documentation Review

Assess BAS access, building documentation, and utility consumption history

3

Application Preparation

Coordinate program enrollment aligned with BC Hydro/FortisBC requirements

4

Project Approval

Proceed only upon confirmation of program suitability for your facility

VSM Dashboard - Equipment-level energy visibility

Equipment-level energy consumption visualization

Sample output from an active C-Op engagement—no additional hardware installation required.

View additional VSM analytics examples
Program Structure

Three-Phase Delivery with Milestone-Based Funding

Funding is based on facility size, up to $0.15 per square foot.

1
1

Investigation

4-6 months

Site investigation, system review, and opportunity identification using VSM analytics.

75% funding released after report
2
2

Implementation

5-6 months

You choose which measures to proceed with. We support implementation.

3
3

Completion

1-2 months

Verification and documentation for program close-out.

Final 25% funding released
Service Delivery

VSM-Enabled Analysis and Implementation Support

SISA delivers Continuous Optimization services using our Virtual Submetering platform, providing equipment-level energy disaggregation and actionable operational recommendations.

SISA Deliverables

  • Energy consumption analysis and equipment-level disaggregation using VSM technology
  • Building automation system review and operational trend analysis
  • On-site investigation and functional performance verification
  • Identification and prioritization of operational efficiency measures
  • Detailed implementation recommendations with actionable specifications
  • Coordination support with building operators and service contractors
  • Post-implementation monitoring and performance verification
  • Program-compliant documentation for close-out requirements
  • Ongoing performance monitoring through VSM platform access
Energy consumption breakdown by equipment

Software-Based Monitoring

VSM utilizes existing BAS data streams—no additional sensor or metering hardware required.

Program Requirements

Full Eligibility Checklist

Core requirements

  • Commercial or institutional building of at least 40,000 square feet
  • Building owner or long-term leaseholder with operational authority
  • Direct digital control (DDC) building automation system with remote access capability
  • No major mechanical system replacements or renovations planned within 12 months
  • Minimum one year of BC Hydro electricity billing history
  • Availability of building documentation (mechanical drawings, control sequences, TAB reports)

Funding: Up to $0.15/sq ft through BC Hydro (FortisBC customers also eligible). We can help you confirm fit and prepare the application.

Published Program Performance Data (Industry Aggregate)

5.7%

Average energy cost reduction

1.7 yr

Typical simple payback period

Based on published program study data. Individual facility results will vary based on building characteristics and measure implementation.

Additional Information

Frequently Asked Questions

Begin Your Building Optimization Assessment

For buildings of 40,000 square feet or greater with remote BAS access, our team can confirm program eligibility and coordinate enrollment with minimal operational disruption.

If you are currently working with a Key Account Manager or Resource Energy Manager, please advise and we will coordinate accordingly.